|
The fully assembled rack-and- pinion unit is put on Turn One’s unique test dyno, which is used to perform a series of functionality inspections. These include basic leak checks at the seals, a pressurized test for internal leaks, and a “pressure effort” test on the valve, which involves “turning” the rack back and forth. In all, each rack spends about 20 minutes on the dyno. View Related Article
|
|